The project is a modification to existing dam structure, including new intake and outlet control buildings, 54 inch diameter steel pipe installation and a 2,000 ft shotcreted, cast-in-place concrete lined maintenance tunnel.
ISI performed QC inspection and materials testing services for the Construction Contractor.
- Connector.
Duration
Completed in 2010
- Connector.
Construction Value
$38 Million
- Connector.
Owner
Santa Clara Valley Water District