The project is a modification to existing dam structure, including new intake and outlet control buildings, 54 inch diameter steel pipe installation and a 2,000 ft shotcreted, cast-in-place concrete lined maintenance tunnel.
ISI performed QC inspection and materials testing services for the Construction Contractor.

  • Connector.

    Duration

    Completed in 2010

  • Connector.

    Construction Value

    $38 Million

  • Connector.

    Owner

    Santa Clara Valley Water District

Share this Project