BART requires increased maintenance capacity as part of its Fleet of the Future program. The Hayward Maintenance Complex (HMC) will ensure that BART’s maintenance and repair capacity is sufficient to support the new railcar fleet for both the current system and system expansions.

The HMC project consists improvements to three properties on the west side of the existing Hayward Yard for a larger primary repair shop, a new component repair shop, a vehicle overhaul shop, a new central parts warehouse, and new maintenance and engineer­ing repair shops. It also includes the construction of additional storage tracks for a maximum of 250 vehicles on undeveloped BART property on the east side of the Hayward Yard.

  • Connector.

    Duration

    2015 – Present

  • Connector.

    Construction Value

    $432 Million

  • Connector.

    Owner

    Bay Area Rapid Transit